Party Wall Surveyors in Kensington
Bring the drawings, neighbouring structures and ownership interests together before your Kensington project moves to site.
A tailored quotation for your property and proposed works
No obligation · Discuss your requirements with our team

Harding advises building owners and adjoining owners across Kensington, South Kensington, Holland Park, Earl’s Court and North Kensington. Terraces, mews houses, mansion blocks and converted townhouses require an assessment of the particular works and ownership.
Send the drawings if you are planning work, or the notice and supporting documents if your neighbour is building. We establish the stage reached and confirm the appropriate advice, scope and fees before instruction.
Kensington’s buildings need a property-specific review
Historic alterations, shared chimney stacks and lower-ground accommodation can make a townhouse more complex than its street frontage suggests. Stucco-fronted terraces sit alongside mansion blocks, mews properties and mixed-use buildings.
Mews plots can place new foundations close to neighbouring structures. In mansion blocks and conversions, floors or other partitions between separately owned parts can be party structures. The building’s value or conservation status does not decide whether the Act applies; the structural relationship and proposed works matter.
Basements, structural alterations and compact plots
Enquiries include basement excavation, underpinning, structural steelwork, chimney-breast removal, alterations to vaults and mews extensions. Basement schemes particularly need clear foundation and temporary-works information, showing how the proposals relate to adjoining structures.
The Act covers specified work to an existing party wall or party structure, construction of a wall at or astride a boundary and qualifying nearby excavation. The excavation provisions require distance and depth to be considered together, including the relevant statutory geometry. The project’s name alone does not establish which notice is required.
Planning permission, Building Regulations and any necessary landlord or listed-building consent remain separate. Review the actual design before assuming those approvals complete the party wall steps.
Identify the ownership interests before serving notices
Kensington flats can involve freeholders, head leaseholders and qualifying long leaseholders. A managing agent’s involvement does not establish authority to consent for every relevant owner; titles and leases should be checked.
Party-structure notices normally require two months’ notice. New boundary-wall and qualifying excavation notices normally require one month. For party-structure and excavation notices, no written consent within 14 days generally creates a deemed dispute. Section 1 boundary-wall notices have different consequences: silence does not permit a new wall astride a neighbour’s land.
Allow time for ownership checks, adequate drawings, correct service and any surveyor procedure before notifiable work starts. A contractor’s provisional date is not confirmation that those steps are complete. Read our notice-period guide.
If your neighbour proposes building work
Consider the notice with its plans, sections and relevant proposed methods. Ask promptly about missing information and explain concerns about access, protection or existing defects before choosing a response.
Where the statutory dispute procedure applies, the owners can jointly appoint one agreed surveyor or appoint separate surveyors, who select a third surveyor. Every appointed surveyor must act impartially, including when appointed by one owner. The role is distinct from advocating an owner’s position on every aspect of a project.
See our adjoining-owner guide. Written consent may be appropriate after an informed review; receiving a notice does not mean you must automatically object.
Agree the record, safeguards and inspections
A schedule of condition records the relevant accessible areas inspected before work. It can help compare later concerns with pre-existing defects, but it is not automatically a full building or structural survey.
Where required, an award can address relevant methods, timing, protection, inspections and damage procedures within the Act. It does not guarantee a damage-free build or replace the designer’s responsibilities.
Include the structural and temporary-works drawings, existing notices, appointment correspondence and live deadlines. Explain any basement or vault works already undertaken. Further inspections and specialist design review should be identified in the agreed instruction.
A quotation for the property and proposed works
Harding provides a tailored quotation. The proposals, affected owners, information available, access and issues requiring resolution affect the work needed. Your quotation identifies the scope, professional fee, VAT treatment and how additional services would be handled.
The building owner normally meets reasonable statutory costs for work undertaken for their benefit, subject to the circumstances and allocation under the Act. There is no standard charge or guaranteed award timetable for every property.
An award does not settle every boundary ownership question or provide every permission a project needs. Our boundary survey service may be relevant if the boundary itself is disputed. For independent background, read the government explanatory booklet.
What our clients say
Your party wall questions answered
Does a listed property automatically need an award?
No. The works and statutory procedure determine whether an award is required. Listed-building consent and conservation controls are separate.
Can a managing agent consent for every owner?
Not automatically. The titles, leases and agent’s authority must be checked; several qualifying owners may be involved.
Is every basement project notifiable?
The excavation, neighbouring foundations and work to party structures must be assessed. The project label alone does not establish the notices required.
Does an award grant unrestricted access?
No. Access rights are limited by the Act and the circumstances. An award cannot provide every access arrangement a contractor wants.
Can the owners appoint one surveyor jointly?
Yes, where appropriate, both owners may agree on one impartial agreed surveyor rather than separate appointments.
Are further inspections included in the fee?
The quotation defines the scope. Additional visits, revised designs or specialist work should be identified rather than assumed to be included.
Discuss your party wall enquiry in Kensington
Send the Kensington address, drawings or notice and details of the stage reached. Include ownership information and any existing appointments for a tailored scope and quotation.
Call 020 7736 2383 or send our team a message if you would like advice before requesting a quotation.