Find a concise answer, then follow the detailed guide for your situation. Start with the difference between notice, consent and an Award.

A tailored quotation for your property and proposed works

No obligation · Discuss your requirements with our team

Entrances and adjoining façades of period terraced homes
Party Wall & Neighbourly mattersClear advice for your next step.
Independent RICS-regulated firmEstablished 1997London & the South EastClear scope before instruction

Party wall questions often arise when a project is being planned or a neighbour receives a notice. The answer depends on the proposed work and the documents already in place, rather than the project label alone.

These answers concern the Party Wall etc. Act 1996 in England and Wales. Use the focused guides below for the next step, and seek advice on an individual notice, appointment or dispute.

Choose your situation

What are you trying to do?

Plan building work

Check whether the actual proposals are notifiable and what information is needed before serving notice.

Notice guide · Timing guide

Respond to a neighbour

Check the notice, drawings, dates and response options before deciding whether to consent or appoint a surveyor.

Adjoining-owner advice

Understand a document

A notice, written consent, Award and condition record do different jobs.

Consent versus Award · Award contents

Deal with a problem

Work without notice, an existing disagreement and alleged damage need facts and documents before the route is clear.

Dispute advice · No agreement in place

Work-specific answers

Does the type of project decide the answer?

A loft conversion may involve cutting into a party wall for beams or altering a shared chimney. An extension may involve a boundary wall or excavation near neighbouring foundations. Those details matter more than calling the project a “loft” or “extension”.

Qualifying excavation can fall within the Act without any shared wall. Distance is measured in relation to adjoining buildings or structures and must be considered with the relevant depth tests.

Loft conversion guide · 3-metre rule · Section 6 guide · Shared chimney work

Avoid timing mistakes

Which dates should I keep separate?

The minimum notice period, response period, surveyor procedure and planned start date for the contractor are separate. Existing-party-structure notices generally require two months; new-wall and qualifying excavation notices generally require one month.

For relevant existing-structure and excavation notices, lack of written consent within 14 days leads to the statutory dispute route. New-wall notices have distinct consent rules. A quick response is not automatically permission to shorten the minimum notice period.

Where the relevant notice’s one-year validity applies, it concerns commencement of the notified work, not completion of all construction within a year of an Award. Check your specific documents and any Award requirements.

Practical preparation

Keep a useful project record

Retain notices, proof of service, responses, appointments, drawings, condition records and any Award together. Record design changes and dated observations rather than relying on informal recollection.

A Schedule of Condition can help compare relevant areas before and after work, but does not settle every question of causation or liability. A quotation should identify the service, properties, inclusions, VAT treatment and arrangements for additional work.

Condition records · Fees and who pays

Reliable next steps

Where can I read the official guidance?

The GOV.UK explanatory booklet explains the categories of work, notice procedures and surveyor process. The RICS consumer guide explains the roles of owners and appointed surveyors.

Planning permission and building regulations approval are separate from party wall requirements. Boundary ownership disputes also need their own evidence and advice; an Award does not decide where the legal boundary lies.

If the answer depends on a notice you have received or work that has already begun, send the documents and dates when you contact us so the enquiry can be considered in context.

In our clients’ words

What our clients say

Top rated
Harding Chartered Surveyors4.6
Based on 179 reviews
From initial call to report completion - excellent service from all representatives. Would highly recommend
I was very impressed with the responsive, professional and helpful service that I received from Harding Chartered Surveyors. I needed to obtain two surveys to assist with the probate for my brother who had recently passed away. They dealt with my request extremely promptly and with kindness. I asked for a follow-up phone call, so that I could understand one of the figures more fully and Charlie Colville was extremely helpful and gave his time willingly. I will definitely use this firm again if I need a surveyor in the future.
Jessica Toogood arrived at time scheduled. We had house valuation done due to dad passing for IHT. Jessica took adequate time in each area of dads house, was very professional, friendly, gathered all information needed.
Your questions answered

Common Party Wall Act questions

What is a party wall?

It can be a wall standing astride the boundary or a wall separating buildings in different ownerships in the circumstances defined by the Act. A party fence wall is an above-ground wall astride the boundary, separate from a building; wooden fences and hedges are excluded from that definition.

Does every extension require a party wall notice?

No. The actual proposals must be assessed. A project may include notifiable boundary-wall work, work to a party structure or qualifying excavation, but proximity alone does not answer every case.

Does planning permission remove the need for notice?

No. Planning permission and building regulations are separate from the Party Wall procedure. The Act still needs to be considered where the proposed work falls within it.

Is silence the same as written consent?

No. For relevant existing-party-structure and excavation notices, lack of written consent within 14 days leads to the statutory dispute procedure. New-wall notices have distinct rules and should be assessed separately.

Must both owners have different surveyors?

No. They can jointly appoint one agreed surveyor where appropriate. If separate surveyors are appointed, those surveyors select a third surveyor. All appointed statutory surveyors must act impartially.

Can my neighbour stop all of my proposed works by dissenting?

Dissent is not necessarily a veto on work authorised under the Act; the relevant dispute can be addressed through the surveyor procedure. Different rights and consent requirements apply to a new wall astride the boundary and to matters outside the Act.

Who normally pays the surveyor costs?

The building owner normally meets reasonable party wall costs for works undertaken for their benefit. Allocation can differ for repairs, shared benefit and particular circumstances. Check private advice terms and the proposed statutory scope.

What if I disagree with a Party Wall Award?

An owner can appeal to the county court within 14 days of service. Obtain legal advice promptly if considering a challenge, because the deadline is short.

Your next step

Ask about your party wall situation

Tell us whether you are planning work or responding to a neighbour’s proposals. Include the property address, the stage reached and any notices or drawings you already have. We will confirm the appropriate scope and fees before instruction.

Call 020 7736 2383 or send our team a message if you would like advice before requesting a quotation.