Section 6 of the Party Wall Act
Excavating near a neighbouring building or structure? Whether Section 6 applies depends on both distance and depth. Check the design and foundation information before deciding which procedure applies.
Bespoke quotation · scope and fee agreed before instruction
No obligation · Discuss your requirements with our team

Section 6 of the Party Wall etc. Act 1996 deals with excavation near adjoining buildings and structures in England and Wales. It can apply to work entirely on your own land, even where there is no shared party wall.
Harding Chartered Surveyors advises building owners and adjoining owners on the notice and surveying procedure. The starting point is the proposed excavation, its relationship to neighbouring structures and the available foundation information.
What are the three-metre and six-metre tests?
| Distance from neighbouring building or structure | Relevant depth test |
|---|---|
| Within three metres | The excavation extends below the bottom of the neighbouring foundations. |
| Within six metres | The excavation meets a plane drawn downwards at 45° from the bottom of the neighbouring foundations towards the excavation. |
Both the horizontal distance and excavation depth need consideration. The six-metre test can matter for deeper excavations, such as some basement designs; it is not a universal six-metre exclusion zone around every property.
Dimensions should be checked against the neighbouring building or structure, rather than measured only from a fence or the plot boundary. Our three-metre rule guide explains that specific test.
Can Section 6 apply beyond party walls?
Yes. The statutory tests concern neighbouring buildings and structures; they do not require the excavation to touch a shared wall. A detached extension or excavation wholly within one owner’s garden can still qualify.
Nor should masonry garden or boundary walls be ruled out merely because they are not party walls. The nature of the adjoining structure, its foundations and the excavation must be assessed.
Work on an existing party structure or a new wall at the boundary can require other notices as well. One project may engage several parts of the Act, each with its own requirements.
What information is needed to assess the work?
Useful information includes a site plan, proposed foundation or basement drawings, excavation depths and levels, the location of neighbouring structures and reliable information about their foundations.
If the neighbouring foundation depth is uncertain, do not assume it is shallower or deeper simply from the building’s age. Your advisers should explain what information is required and whether further investigation is appropriate. Any trial pit, access or specialist investigation needs suitable agreement and arrangements.
The design team remains responsible for its design. Party wall advice does not replace structural engineering, temporary works design or building regulations approval.
What must the excavation notice include?
A Section 6 notice must identify the proposed excavation and its intended start, and be accompanied by plans and sections showing its position and depth and the location of any proposed building or structure. It must also state whether the building owner proposes to underpin, strengthen or otherwise safeguard the neighbouring foundations.
These drawings are a notice requirement, not simply optional supporting material. General architectural elevations alone may not explain the depth and relationship to the neighbouring foundations.
The relevant adjoining owners must be identified and served correctly. A property can have more than one qualifying owner. Read our notice guide for ownership and service considerations.
How long is the notice period and how can the neighbour respond?
A Section 6 notice must be served at least one month before the relevant excavation begins. The adjoining owner has 14 days to give written consent; if they dissent or do not give written consent within that period, a dispute is deemed to arise under the Act.
The response deadline is separate from the minimum notice period. An earlier start requires the appropriate agreement. Relevant work should not be started on the assumption that merely sending a notice completes the procedure.
An adjoining owner can raise concerns about the foundations and applicable safeguards through the statutory process. A generic “counter-notice” is not a substitute for checking the specific Section 6 rights and requirements. See notice periods for the wider sequence.
When is a surveyor or award needed?
Where the statutory dispute procedure applies, the owners can agree to one surveyor or appoint separate surveyors, who select a third surveyor. Every appointed surveyor must act impartially. An award can determine relevant rights and the timing and manner of the notifiable work within the Act’s scope.
Written consent may avoid the need for an award at that stage, though a Schedule of Condition can still provide a useful record. The surveyor should explain any proposed inspections and the limits of the instruction.
Consent or an award does not replace any required planning permission or building regulations approval, or resolve disputes about boundaries or other property rights. Nor does a party wall appointment automatically provide continuous site supervision or a guarantee against damage.
How Harding can help with Section 6 matters
Send the information
Share the address, excavation drawings, levels and available foundation details.
Discuss the procedure
Identify the relevant notices, owners and additional information needed.
Agree the instruction
Confirm the scope, fee, applicable VAT and expected timing.
Address the response
Discuss consent, surveyor appointments and an award where required.
We provide a bespoke quotation because scope varies with the excavation, adjoining owners, design information and further procedure. Tell us promptly if excavation has already begun or damage is alleged; those circumstances need specific advice.
Official Section 6 guidance
The excavation section of the government’s explanatory booklet explains the tests, plans and sections, notice period and adjoining-owner response. The RICS consumer guide covers the wider surveying process.
Return to our party wall services hub for advice on other types of work.
What our clients say
Your questions answered
Does Section 6 apply only to shared party walls?
No. It concerns excavation near neighbouring buildings and structures. It can apply without a shared wall, including to work wholly on the building owner’s land, if the distance and depth tests are met.
Is every excavation within three metres notifiable?
No. The three-metre test also depends on excavation below the bottom of the neighbouring foundations. Distance alone is insufficient. A separate six-metre test can apply to deeper excavation.
What drawings must accompany a Section 6 notice?
Plans and sections showing the excavation’s position and depth and the location of any proposed building or structure are required. The notice must also state whether underpinning, strengthening or other safeguarding of the neighbouring foundations is proposed.
How much notice is required under Section 6?
At least one month. The adjoining owner’s 14-day written-consent deadline is separate. An earlier start requires the appropriate agreement, and the dispute procedure may need to be completed before relevant work begins.
Can a neighbour raise concerns about foundation protection?
Yes. Section 6 includes rights concerning the protection of neighbouring foundations. The appropriate response depends on the proposed work and procedure. Seek advice on the actual notice and drawings.
Does Harding quote a fixed price for every excavation case?
No single price fits every case. We agree a tailored scope and fee based on the drawings, owners involved and required procedure. Any additional engineering or specialist work should be identified separately.
Ask about your proposed excavation
Send the property address, plans and sections, intended excavation depths and any information about neighbouring foundations. Let us know whether you are planning work or responding to a notice.
Call 020 7736 2383 or send our team a message if you would like advice before requesting a quotation.