Excavating near a neighbouring building or structure? Whether Section 6 applies depends on both distance and depth. Check the design and foundation information before deciding which procedure applies.

Bespoke quotation · scope and fee agreed before instruction

No obligation · Discuss your requirements with our team

People discussing construction drawings at a table with a hard hat
Party wall & neighbourly mattersClear scope. Practical advice.
Independent RICS-regulated firmEstablished 1997London & the South EastClear scope before instruction

Section 6 of the Party Wall etc. Act 1996 deals with excavation near adjoining buildings and structures in England and Wales. It can apply to work entirely on your own land, even where there is no shared party wall.

Harding Chartered Surveyors advises building owners and adjoining owners on the notice and surveying procedure. The starting point is the proposed excavation, its relationship to neighbouring structures and the available foundation information.

Distance and depth together

What are the three-metre and six-metre tests?

Distance from neighbouring building or structureRelevant depth test
Within three metresThe excavation extends below the bottom of the neighbouring foundations.
Within six metresThe excavation meets a plane drawn downwards at 45° from the bottom of the neighbouring foundations towards the excavation.

Both the horizontal distance and excavation depth need consideration. The six-metre test can matter for deeper excavations, such as some basement designs; it is not a universal six-metre exclusion zone around every property.

Dimensions should be checked against the neighbouring building or structure, rather than measured only from a fence or the plot boundary. Our three-metre rule guide explains that specific test.

No shared wall required

Can Section 6 apply beyond party walls?

Yes. The statutory tests concern neighbouring buildings and structures; they do not require the excavation to touch a shared wall. A detached extension or excavation wholly within one owner’s garden can still qualify.

Nor should masonry garden or boundary walls be ruled out merely because they are not party walls. The nature of the adjoining structure, its foundations and the excavation must be assessed.

Work on an existing party structure or a new wall at the boundary can require other notices as well. One project may engage several parts of the Act, each with its own requirements.

Establish the relevant levels

What information is needed to assess the work?

Useful information includes a site plan, proposed foundation or basement drawings, excavation depths and levels, the location of neighbouring structures and reliable information about their foundations.

If the neighbouring foundation depth is uncertain, do not assume it is shallower or deeper simply from the building’s age. Your advisers should explain what information is required and whether further investigation is appropriate. Any trial pit, access or specialist investigation needs suitable agreement and arrangements.

The design team remains responsible for its design. Party wall advice does not replace structural engineering, temporary works design or building regulations approval.

Section 6 notice requirements

What must the excavation notice include?

A Section 6 notice must identify the proposed excavation and its intended start, and be accompanied by plans and sections showing its position and depth and the location of any proposed building or structure. It must also state whether the building owner proposes to underpin, strengthen or otherwise safeguard the neighbouring foundations.

These drawings are a notice requirement, not simply optional supporting material. General architectural elevations alone may not explain the depth and relationship to the neighbouring foundations.

The relevant adjoining owners must be identified and served correctly. A property can have more than one qualifying owner. Read our notice guide for ownership and service considerations.

One-month notice route

How long is the notice period and how can the neighbour respond?

A Section 6 notice must be served at least one month before the relevant excavation begins. The adjoining owner has 14 days to give written consent; if they dissent or do not give written consent within that period, a dispute is deemed to arise under the Act.

The response deadline is separate from the minimum notice period. An earlier start requires the appropriate agreement. Relevant work should not be started on the assumption that merely sending a notice completes the procedure.

An adjoining owner can raise concerns about the foundations and applicable safeguards through the statutory process. A generic “counter-notice” is not a substitute for checking the specific Section 6 rights and requirements. See notice periods for the wider sequence.

Resolving a statutory dispute

When is a surveyor or award needed?

Where the statutory dispute procedure applies, the owners can agree to one surveyor or appoint separate surveyors, who select a third surveyor. Every appointed surveyor must act impartially. An award can determine relevant rights and the timing and manner of the notifiable work within the Act’s scope.

Written consent may avoid the need for an award at that stage, though a Schedule of Condition can still provide a useful record. The surveyor should explain any proposed inspections and the limits of the instruction.

Consent or an award does not replace any required planning permission or building regulations approval, or resolve disputes about boundaries or other property rights. Nor does a party wall appointment automatically provide continuous site supervision or a guarantee against damage.

A brief based on the design

How Harding can help with Section 6 matters

  1. Send the information

    Share the address, excavation drawings, levels and available foundation details.

  2. Discuss the procedure

    Identify the relevant notices, owners and additional information needed.

  3. Agree the instruction

    Confirm the scope, fee, applicable VAT and expected timing.

  4. Address the response

    Discuss consent, surveyor appointments and an award where required.

We provide a bespoke quotation because scope varies with the excavation, adjoining owners, design information and further procedure. Tell us promptly if excavation has already begun or damage is alleged; those circumstances need specific advice.

Check the primary source

Official Section 6 guidance

The excavation section of the government’s explanatory booklet explains the tests, plans and sections, notice period and adjoining-owner response. The RICS consumer guide covers the wider surveying process.

Return to our party wall services hub for advice on other types of work.

In our clients’ words

What our clients say

Top rated
Harding Chartered Surveyors4.7
Based on 179 reviews
From initial call to report completion - excellent service from all representatives. Would highly recommend
I was very impressed with the responsive, professional and helpful service that I received from Harding Chartered Surveyors. I needed to obtain two surveys to assist with the probate for my brother who had recently passed away. They dealt with my request extremely promptly and with kindness. I asked for a follow-up phone call, so that I could understand one of the figures more fully and Charlie Colville was extremely helpful and gave his time willingly. I will definitely use this firm again if I need a surveyor in the future.
Jessica Toogood arrived at time scheduled. We had house valuation done due to dad passing for IHT. Jessica took adequate time in each area of dads house, was very professional, friendly, gathered all information needed.
Good overall experience.
I contacted Handing Chartered Surveyors to undertake a Level 2 RICS survey for a help to buy redemption in Southall, following issues with the paperwork produced by a large online competitor, resulting in the original valuation document being rejected. On contacting Harding I set out my needs along with the issues faced previously, and Harding were very quick to respond, as well as to confirm they were happy to be flexible if there were issues with the process after the valuation report was produced. Jessica from the team visited and undertook the survey following a discussion about my specific situation and needs, as well as discussing the process and next steps. She was kind, courteous and communicative throughout, calling to discuss the valuation prior to it being finalised and issued. Help to Buy subsequently accepted the valuation with no issues at all, a success! While it is sometimes cheaper and quicker to go with a large provider, it is also very difficult to discuss case specifics, and to address any challenges. I am personally very grateful for the service I received, a strong reminder to go local to get what you need, and I will very happily employ Harding again for any future survey needs.
Harding Surveyors are very prompt, professional and helpful. Their reports are detailed and very clear. They have saved me from major property headaches that I couldn’t see myself.
Excellent ! Very professional. The report was produced quickly. Charlie, the surveyor, was excellent. I have no hesitation in recommending Harding.
Very straighforward process, excellent support from staff
Alaa came when Hardings said he would, looked at everything, explained as he was going along, explained what he thought the issues were as he surveyed, took time to talk to our neighbour who is also affected by the subsidence, sent report when promised and then has been very available to explain what might happen next and why. Great service.
Extremely professional service. Easy to contact and to establish a good rapport. The final report was extraordinary in detail
Very happy with the service provided. Arrangements were promptly made to access the property to undertake the valuation, after which the report was sent several days later. The report is comprehensive and is of a high professional standard. Overall very pleased with the service. I will return again should I need any more help in the future.
Delivered ahead of time and in agreed scope.
Good service, the initial deadline was missed but the quality of work is good.
I have used Harding Chartered Surveyors three times in the last 2 years to carry out valuations of properties. I found them to be efficient and good value. Kate always got back to me quickly and I was also able to communicate directly with the surveyor. Their final reports were polished and professional. I can recommend.
Extremely professional and personal service. I commissioned two reports recently, one for a structural engineering inspection and one for a full level three report. Both reports gave me what I required and more. I would highly recommend.
Your questions answered

Your questions answered

Does Section 6 apply only to shared party walls?

No. It concerns excavation near neighbouring buildings and structures. It can apply without a shared wall, including to work wholly on the building owner’s land, if the distance and depth tests are met.

Is every excavation within three metres notifiable?

No. The three-metre test also depends on excavation below the bottom of the neighbouring foundations. Distance alone is insufficient. A separate six-metre test can apply to deeper excavation.

What drawings must accompany a Section 6 notice?

Plans and sections showing the excavation’s position and depth and the location of any proposed building or structure are required. The notice must also state whether underpinning, strengthening or other safeguarding of the neighbouring foundations is proposed.

How much notice is required under Section 6?

At least one month. The adjoining owner’s 14-day written-consent deadline is separate. An earlier start requires the appropriate agreement, and the dispute procedure may need to be completed before relevant work begins.

Can a neighbour raise concerns about foundation protection?

Yes. Section 6 includes rights concerning the protection of neighbouring foundations. The appropriate response depends on the proposed work and procedure. Seek advice on the actual notice and drawings.

Does Harding quote a fixed price for every excavation case?

No single price fits every case. We agree a tailored scope and fee based on the drawings, owners involved and required procedure. Any additional engineering or specialist work should be identified separately.

Your next step

Ask about your proposed excavation

Send the property address, plans and sections, intended excavation depths and any information about neighbouring foundations. Let us know whether you are planning work or responding to a notice.

Call 020 7736 2383 or send our team a message if you would like advice before requesting a quotation.