Schedule of Condition in London
Record the visible condition of a property before a lease or nearby building works. Clear written descriptions and photographs provide a useful reference for landlords, tenants and property owners.
Bespoke quotation · scope and fee agreed in advance
No obligation · Discuss your requirements with our team

A Schedule of Condition records the condition of agreed parts of a property on a particular date. Harding Chartered Surveyors prepares clear written and photographic records across London and the South East, with the purpose, areas and access agreed before inspection.
What is a Schedule of Condition?
A Schedule of Condition describes the visible state of the property at the inspection date. It can record existing cracking, damaged finishes, damp staining, wear and other features within the agreed scope, supported by photographs that identify their location.
The schedule is a factual record, rather than an automatic diagnosis of every defect or a guarantee about concealed parts. Its usefulness depends on the clarity of the descriptions, photographs, coverage and recorded limitations.
Common reasons for commissioning a schedule include entering a lease, documenting neighbouring property before works, or agreeing a reference point between owners and occupiers. Tell us how the document will be used so the brief addresses that purpose.
How can a schedule help landlords and tenants?
For a prospective tenant, a schedule can document the premises before occupation and support discussions about the repairing obligation. For a landlord, it provides a clearer record that can be referred to when considering condition later in the lease.
The lease wording is decisive. A schedule does not automatically limit liability or require the property to be returned in exactly the recorded condition. Your solicitor should advise on how the schedule is referenced and incorporated into the agreement, and on the effect of the repairing clauses.
Arrange the inspection in time for the document to be reviewed before the lease is concluded. If you have already signed a lease, explain when occupation began and what earlier condition evidence is available.
For a broader assessment of condition before taking premises, consider a commercial building survey. For alleged lease breaches, see our Schedule of Dilapidations service.
What does the schedule include?
Coverage is agreed around the property and purpose. Where included in the brief and safely accessible, the record can consider:
- Walls, ceilings, floors and visible internal finishes.
- Doors, windows, frames and relevant joinery.
- Visible cracking, staining, damage and existing disrepair.
- Relevant external elevations, roofs and rainwater goods visible from agreed inspection positions.
- Other defined areas, such as a basement, garden boundary or adjoining room.
Access and scope are recorded. Furniture, stored items, occupation, height and restricted areas can limit what is visible. We identify relevant limitations rather than treating inaccessible parts as inspected.
Opening-up, specialist testing, structural calculations, repair specifications and cost estimates require separate agreement where needed.
Why use a photographic Schedule of Condition?
Photographs help show location, extent and appearance, while written descriptions explain what the reader is looking at. Together they are more useful than an unorganised set of close-up images with no room or elevation references.
A clear record can help the parties compare later observations with the condition originally documented. It can reduce uncertainty, but photographs are not irrefutable proof of every aspect of the building or of who caused a later defect.
Keep the completed schedule and relevant agreements safely. If a change or dispute arises, preserve dated correspondence and seek advice about any additional inspection required.
Schedules for neighbouring and party wall matters
A schedule may be commissioned before works near an adjoining property to record relevant accessible areas. The areas should reflect the nature and location of the proposed work, rather than assuming every part of every neighbouring building needs the same coverage.
A condition record does not replace party wall notices, an award or other required permissions. The applicable procedure and access arrangements should be addressed separately. See our party wall Schedule of Condition guide for that context.
If access is restricted or not agreed, tell the appointed surveyor. Any external-only record should explain its limits. An incomplete record does not by itself determine the parties’ legal rights or prevent a later claim.
How much does a Schedule of Condition cost?
We provide a tailored quotation because the work depends on the size of the premises, the areas covered and the detail needed. A limited neighbouring-property record and a full commercial lease schedule involve different instructions.
- Floor area, layout, number of rooms or units.
- Internal and external areas included.
- Property condition and the amount of detail to record.
- Occupation, access restrictions and inspection arrangements.
- Photographic requirements, reporting format and deadline.
- Review of an existing schedule or any later return visit.
Your quotation confirms the scope, fee, applicable VAT and expected timing. Additional inspections or specialist investigations are identified separately. Send the property details and explain the intended use of the schedule for an appropriate quote.
How do I arrange the schedule?
Explain the purpose
Tell us the property, parties, lease or works context and relevant dates.
Agree the brief
Confirm the areas, access, document format, fee and expected timing.
Record condition
The surveyor inspects the agreed accessible parts and prepares descriptions and photographs.
Review and retain
Check the document and arrange any necessary agreement or incorporation with your advisers.
Raise lease-signing or building-work deadlines at enquiry. The inspection should take place at a useful stage, before the relevant change wherever practical, and access needs to be arranged in advance.
Why choose Harding Chartered Surveyors?
Harding is an independent, RICS-regulated firm established in 1997, serving London and the South East. We prepare property-condition records for commercial leasing and neighbouring-work contexts.
We help define a proportionate scope and explain what has been recorded, what could not be inspected and whether other advice is required. The aim is a usable record for the people who need to rely on it.
Verify our RICS registration ↗ · Our offices · Explore all property surveys
What our clients say
Schedule of Condition FAQs
Does a Schedule of Condition automatically limit repairing liability?
No. Its effect depends on the lease wording and how the document is incorporated into the agreement. A solicitor should advise on the repairing obligation and legal effect before the lease is signed.
Is it the same as a building survey?
No. A Schedule of Condition is primarily a dated record of visible condition within an agreed scope. A building survey provides assessment and advice on defects and repair implications. Tell us whether you need a record, a wider assessment or both.
Will photographs be included?
Our schedules use photographs alongside written descriptions to identify the areas and condition recorded. We agree the coverage and format before inspection and state relevant access limitations.
Can the schedule be prepared before neighbouring works?
Yes. Relevant accessible parts of a neighbouring property can be recorded before works, with the scope reflecting the proposed work. A condition record does not replace party wall procedures or other required permissions.
What if an area cannot be accessed?
The schedule should record the restriction and avoid presenting inaccessible parts as inspected. Discuss access arrangements with the surveyor before the visit. The limits of the record do not automatically determine legal rights or liability.
What determines the fee and timing?
The fee and timing depend on the property, areas included, detail required, access and reporting arrangements. Your tailored quotation confirms the scope, fee, applicable VAT and expected delivery before instruction.
Request your Schedule of Condition quotation
Tell us the property details, whether the schedule is for a lease or nearby works, the areas to be recorded and any key dates. We will confirm the appropriate scope and fee.
For commercial or party wall work, describe the purpose and any relevant lease or proposed works in your enquiry so we can confirm the appropriate scope.
Call 020 7736 2383 or send our team a message if you would like advice before requesting a quotation.


