Check the party wall, structural and property-rights issues before repairing or removing a shared chimney stack or breast. Agree the appropriate advice for the actual work.

Tailored quotation · scope and fees agreed before instruction

No obligation · Discuss your requirements with our team

Metal-capped chimney stack above a tiled roof
Party wall & neighbourly adviceUnderstand the process. Plan the next step.
Independent RICS-regulated firmEstablished 1997London & the South EastClear scope before instruction

Harding Chartered Surveyors provides independent party wall and neighbourly advice across London and the South East. Tell us about the property, your role and the issue so we can discuss the appropriate service.

Identify what is shared

Repairing or removing a shared chimney

A chimney stack is the part rising above the roof. A chimney breast is the projecting structure inside the building. A proposal can affect one or both, together with flues, roof coverings and the support for masonry left in place.

Where a chimney is shared or connected to a party wall, the proposed work may raise party wall, structural, ownership and access questions. Those questions need to be considered together, but each has a different purpose.

Describe exactly what is to be repaired, removed or retained. The phrase “chimney removal” alone is not enough to decide the correct procedure or safe design.

Check the relevant procedure

When might a Party Wall Notice be needed?

Work involving a party wall or party structure can fall within the Party Wall etc. Act 1996. Cutting away a chimney breast, altering shared masonry or carrying out relevant repairs can require notice, depending on the actual work.

The appropriate notice, information and timing should be checked before work begins. Written consent and a Party Wall Award are different routes; not every project automatically requires an Award. If the statutory dispute procedure applies, appointed surveyors act impartially.

Read our Agreement guide and Notice guide. Do not treat a conversation with the neighbour as a substitute for checking the formal requirements.

Design must address what remains

Structural support and other approvals

Removing part of a chimney can affect masonry above, roof details and neighbouring construction. Appropriate structural assessment and design should establish how remaining loads are supported and how the work is sequenced.

A party wall appointment does not automatically include structural calculations, Building Regulations approval, planning advice, listed-building consent or construction supervision. Those requirements must be addressed separately with the appropriate professionals.

Do not assume an Award certifies the builder's work or guarantees structural safety. If a chimney is unstable or there is an immediate safety concern, obtain appropriate urgent assistance rather than relying on a routine quotation process.

Consider effects on adjoining property

Flues, weathering and access

Check whether the neighbour uses a connected flue and how proposed works affect ventilation, weatherproofing, flashings and retained masonry. An apparently redundant fireplace does not establish that every part of a shared stack is unused.

Access, scaffolding and protection arrangements should be planned, not assumed. Ownership and rights to alter or use adjoining land can need legal advice separately from the Act.

Before work begins, the condition of relevant adjoining areas can be recorded in a Schedule of Condition. A later inspection or monitoring visit is included only where expressly agreed; the record does not itself prevent damage or establish the cause of every later defect.

Agree what the investigation will establish

Condition concerns before you choose a remedy

Cracked pointing, loose masonry, defective flashings or damp near a chimney may need investigation before choosing between repair, partial removal and replacement. Visible symptoms do not always identify the route of water entry or the condition of concealed construction.

A roof survey or focused defect report may be appropriate for a defined condition concern. Structural design and specialist flue or appliance advice are different instructions.

This guide does not prescribe a repair method or advise on operating a fireplace. Seek the appropriate competent specialist for flue, appliance and fire-safety matters.

If the work has already started

Missing notices, changes and alleged damage

If relevant works started without notice, obtain advice on the chronology, documents and statutory jurisdiction. Do not assume a later Award automatically regularises completed work. The Act does not provide a specific statutory fine for failure to serve notice; separate court or common-law remedies may be relevant.

Tell the appointed surveyor about changed proposals or alleged damage promptly. Keep photographs, drawings, contractor records and correspondence. Read our missing-notice and damage guides for those distinct situations.

Legal advice may be needed for disputed rights, urgent remedies or a court deadline.

Prepare a useful brief

What should you send with your enquiry?

Send the address, photographs, plans and structural proposals, and explain which parts of the chimney are shared, used, removed or retained. Include notices, responses, an existing Award and any neighbour or freeholder requirements.

Tell us whether you are carrying out the work or are affected by it, whether it has begun and any proposed dates. We can discuss the appropriate party wall advice or condition survey and provide a tailored quotation with VAT and exclusions confirmed.

The government explanatory booklet covers the Act in England and Wales. It is separate from project-specific structural, property-rights and design advice.

In our clients’ words

What our clients say

Top rated
Harding Chartered Surveyors4.6
Based on 179 reviews
From initial call to report completion - excellent service from all representatives. Would highly recommend
I was very impressed with the responsive, professional and helpful service that I received from Harding Chartered Surveyors. I needed to obtain two surveys to assist with the probate for my brother who had recently passed away. They dealt with my request extremely promptly and with kindness. I asked for a follow-up phone call, so that I could understand one of the figures more fully and Charlie Colville was extremely helpful and gave his time willingly. I will definitely use this firm again if I need a surveyor in the future.
Jessica Toogood arrived at time scheduled. We had house valuation done due to dad passing for IHT. Jessica took adequate time in each area of dads house, was very professional, friendly, gathered all information needed.
I contacted Handing Chartered Surveyors to undertake a Level 2 RICS survey for a help to buy redemption in Southall, following issues with the paperwork produced by a large online competitor, resulting in the original valuation document being rejected. On contacting Harding I set out my needs along with the issues faced previously, and Harding were very quick to respond, as well as to confirm they were happy to be flexible if there were issues with the process after the valuation report was produced. Jessica from the team visited and undertook the survey following a discussion about my specific situation and needs, as well as discussing the process and next steps. She was kind, courteous and communicative throughout, calling to discuss the valuation prior to it being finalised and issued. Help to Buy subsequently accepted the valuation with no issues at all, a success! While it is sometimes cheaper and quicker to go with a large provider, it is also very difficult to discuss case specifics, and to address any challenges. I am personally very grateful for the service I received, a strong reminder to go local to get what you need, and I will very happily employ Harding again for any future survey needs.
Harding Surveyors are very prompt, professional and helpful. Their reports are detailed and very clear. They have saved me from major property headaches that I couldn’t see myself.
Excellent ! Very professional. The report was produced quickly. Charlie, the surveyor, was excellent. I have no hesitation in recommending Harding.
Very straighforward process, excellent support from staff
Extremely professional service. Easy to contact and to establish a good rapport. The final report was extraordinary in detail
Very happy with the service provided. Arrangements were promptly made to access the property to undertake the valuation, after which the report was sent several days later. The report is comprehensive and is of a high professional standard. Overall very pleased with the service. I will return again should I need any more help in the future.
Delivered ahead of time and in agreed scope.
I have used Harding Chartered Surveyors three times in the last 2 years to carry out valuations of properties. I found them to be efficient and good value. Kate always got back to me quickly and I was also able to communicate directly with the surveyor. Their final reports were polished and professional. I can recommend.
Extremely professional and personal service. I commissioned two reports recently, one for a structural engineering inspection and one for a full level three report. Both reports gave me what I required and more. I would highly recommend.
Always a positive experience with Harding Chartered Surveyors. Thank you
Highly professional and first class service. Reliable and totally trustworthy. Highly recommended for all levels of surveys and the go to surveyor for dependable advice and guidance on your property purchase.
Whenever we have any dealings with Harding Chartered Surveyors, they are always on time, friendly and professional. Fantastic people to work with.
Your questions answered

Shared chimney stack FAQs

Is removing a chimney breast the same as removing the stack?

No. The breast is inside the building and the stack rises above the roof. Either proposal can affect support, retained masonry and adjoining construction, so the exact scope needs to be shown.

Does every chimney repair require a Party Wall Award?

No. The work, notice requirements and response must be assessed. Written consent and an Award are different routes. Do not assume one document is required for every repair.

Does the party wall surveyor design the support?

Structural calculations and design are separate unless expressly included. An Award is not a substitute for appropriate structural design or Building Regulations requirements.

Can I remove a shared stack because my fireplace is unused?

An unused fireplace does not establish whether your neighbour uses the chimney, who owns it or whether removal is structurally suitable. Check the shared arrangement and obtain appropriate advice before deciding on removal.

Are there automatic fines for failing to serve notice?

The Act does not provide a specific statutory fine for failure to serve notice. Separate legal remedies can be relevant, so obtain advice on the actual circumstances rather than assuming a fine or later Award resolves the issue.

What do you need to provide a quotation?

Send plans, photographs, structural proposals, details of the parts to be removed or retained, any existing notices and your role in the project. We will discuss scope, fees, VAT and any separate specialist work.

Your next step

Discuss proposed work to a shared chimney

Send the property address, your role, a short description of the concern and any relevant notices, drawings or correspondence. Explain any proposed start date or deadline. We will confirm the scope, fee, VAT treatment and expected timing for your instruction.