Party Wall advice in London & the South East
Planning work near a neighbour or responding to a notice? Start with your situation and find advice on notices, surveyor appointments and Party Wall Awards.
Bespoke advice for building owners and adjoining owners
No obligation · Discuss your requirements with our team

The Party Wall etc. Act 1996 provides a procedure for certain building work affecting neighbouring property in England and Wales. Harding helps building owners and adjoining owners understand that procedure and the documents needed at each stage.
This page is your starting point. Choose the route below, then use the focused guides for the detail relevant to your project.
Which situation describes you?
I am planning building work
Share the proposed drawings before fixing a start date. We can help identify potentially notifiable work, the relevant owners and the next procedural steps.
My neighbour is planning work
Check the notice, proposed work and response dates. You can seek advice before choosing whether to consent or appoint a surveyor where the statutory procedure applies.
What work can fall within the Act?
Common examples include cutting into a party wall for a beam, altering a shared chimney structure, building a new wall at the boundary and excavating near a neighbouring building or structure. Whether notice is required depends on the proposed work, the neighbouring structures and the statutory tests.
Not every project beside a neighbour is notifiable. Planning permission and building regulations are separate, and neither replaces the Party Wall procedure where it applies.
Explore loft conversions, shared chimneys, the 3-metre excavation rule and Section 6 excavations.
Notice, response and the route forward
- Check the proposals. Establish which works may fall within the Act and who should receive notice.
- Serve the appropriate notice. The notice type determines its contents and minimum period.
- Understand the response. Written consent and the surveyor procedure are different routes. Silence is not consent.
- Resolve relevant disputes. An agreed surveyor, or separately appointed surveyors, may make an Award setting out matters within their statutory remit.
Existing-party-structure notices generally require two months; new-wall and qualifying excavation notices generally require one month. Response deadlines and surveyor preparation time are separate. See notice periods before agreeing a programme.
Understand the document you need
Written consent or Award
Written consent records agreement to notified proposals. An Award resolves a relevant dispute through the statutory surveyor procedure.
Schedule of Condition
A scoped record of relevant property condition before works, useful when assessing a later allegation of damage.
Boundary evidence
A disagreement about the legal boundary needs its own evidence and advice. Party wall surveyors do not determine boundary ownership under the Act.
Fees depend on the instruction
We provide a tailored quotation after understanding the property, proposed works, ownerships and stage reached. A notice-only instruction is different from a surveyor appointment involving inspections, drawings, an Award and later questions.
For works benefiting the building owner, that owner will normally meet reasonable party wall costs. Different allocations can apply to repairs, shared benefit or particular circumstances. Ask what the quotation includes, how VAT is treated and how additional work will be authorised.
If work has started or a disagreement arises
If qualifying work has begun without notice, or damage is alleged, the right response depends on the facts and any existing notices or appointments. Do not assume that a later Award can automatically correct missing earlier steps. Obtain prompt advice, especially if works are continuing or a court deadline may apply.
Dispute advice · Work without notice · Alleged damage
For an independent overview, read the GOV.UK explanatory booklet and RICS consumer guide.
Party Wall advice in London & the South East FAQs
Do I always need a party wall surveyor?
Not every nearby building project falls within the Act, and written consent can avoid the need for an Award where the relevant procedure permits. A surveyor can help assess applicability and the appropriate next step.
Is a party wall agreement the same as an Award?
People use “party wall agreement” for different documents. Written consent to a notice and a Party Wall Award are distinct: an Award is made through the statutory dispute-resolution procedure.
Does the Act cover the whole UK?
The Party Wall etc. Act 1996 applies in England and Wales. Different rules apply elsewhere in the UK.
How much will the service cost?
Harding provides a tailored quotation based on the works, ownerships, documents and appointment required. Confirm the inclusions, VAT treatment and arrangements for additional work before instructing.
Can one surveyor act for both owners?
Yes, the owners can jointly appoint one agreed surveyor where appropriate. An agreed surveyor and separately appointed statutory surveyors must act impartially.
Can I start as soon as my neighbour consents?
Consent to the proposals does not automatically waive the applicable minimum notice period. Check the intended start date and any express agreement to an earlier start before beginning notifiable works.
Request a tailored party wall quotation
Tell us whether you are planning work or responding to a neighbour’s proposals. Include the property address, the stage reached and any notices or drawings you already have. We will confirm the appropriate scope and fees before instruction.
Call 020 7736 2383 or send our team a message if you would like advice before requesting a quotation.