Party Wall Awards in London
Understand the formal document made by appointed surveyors: when it is needed, what it can cover and what to check before work proceeds.
A tailored quotation for your property and proposed works
No obligation · Discuss your requirements with our team

A Party Wall Award records the determination of matters within the statutory surveyors’ authority when a relevant dispute arises under the Party Wall etc. Act 1996. It is different from a notice and from an adjoining owner’s written consent.
Harding assists with surveyor appointments and Awards for London projects. The appropriate route depends on the works, notices, responses and any existing appointments.
When might a Party Wall Award be needed?
For relevant existing-party-structure or adjacent-excavation notices, a dispute can arise if the adjoining owner dissents or does not give written consent within the statutory response period. The dispute can then be addressed through the Act’s surveyor procedure.
The position is not identical for every notice. New walls at the boundary have distinct rules, including the need for consent to build astride the boundary. An Award cannot simply override a refusal to allow a new wall astride it.
An Award does not mean the neighbours have fallen out personally. It can provide a formal route for examining proposals and settling matters within the Act. See notice, consent and Award compared.
What can the Award contain?
The contents reflect the particular project. Not every Award will contain the same provisions. Relevant matters can include:
- The notifiable work being addressed and the drawings relied on.
- How and when that work may be carried out within the Act’s remit.
- Relevant protective measures and access arrangements.
- The condition record and supporting documents where applicable.
- Responsibilities for relevant expenses and reasonable surveyor costs.
- Procedures or requirements relating to matters arising during the work.
The surveyors’ powers have limits. The document does not provide planning permission or building regulations approval, and it is not a substitute for structural design. It does not determine the legal position of a disputed boundary.
How is an Award prepared?
- Establish the procedure. Review the proposals, notices, responses and valid appointments.
- Gather the information. Obtain relevant drawings, technical details and condition records within scope.
- Consider the issues. The appointed surveyor or surveyors address matters within the statutory remit and seek further information if needed.
- Make and serve the Award. The formal document and supporting material are issued through the applicable procedure.
The owners can jointly appoint one agreed surveyor or appoint separate surveyors where appropriate. With two appointments, those surveyors select a third surveyor at the outset for matters that may need referral.
Every statutory surveyor must act impartially. The appointed surveyors do not simply negotiate as advocates for the respective owners.
How does the condition record fit in?
A Schedule of Condition can record the relevant adjoining areas before work, using written descriptions and photographs. It provides evidence for comparison if damage is later alleged.
Its usefulness depends on access, the areas recorded and the detail of the record. It does not establish in advance that every later defect was caused by the works, and it is not a full survey of the whole property unless separately instructed.
Keep the record with the Award and drawings. Read our party wall Schedule of Condition guide for the inspection scope and limitations.
What should owners check after service?
Read the whole Award and the listed drawings, not only the summary. Check which work it addresses, any relevant conditions and the intended programme. Share applicable requirements with the designer and contractor, and seek clarification if the design changes.
An owner can appeal an Award to the county court within 14 days of service. This is a short legal deadline: obtain prompt legal advice if considering a challenge. Do not assume that a complaint or an informal discussion pauses it.
If damage or a departure from the recorded proposals is alleged, retain dated evidence and contact the appointed surveyor promptly. The appropriate assessment depends on the facts and the statutory scope.
What if work started without notice?
Do not assume an Award can simply be created afterwards to regularise missing notice steps. The available route depends on the type of work, what notices were served and the legal basis for the surveyors’ involvement.
In Power v Shah [2023] EWCA Civ 239, the Court of Appeal considered a case in which no Section 3 notice had been served and the building owner maintained that the Act did not apply. It upheld the finding that the purported Award lacked jurisdiction. This should not be turned into a blanket conclusion about every later dispute or document.
Obtain case-specific advice promptly where works have begun. Our failure-to-serve guide explains the information to gather. The published judgment and GOV.UK booklet provide background.
What our clients say
Party Wall Awards in London FAQs
Is an Award required for every building project?
No. Applicability depends on the work, the notice and the response. Some qualifying proposals proceed with written consent rather than an Award; other projects do not fall within the Act.
Is an Award the same as a party wall notice?
No. A notice informs relevant adjoining owners of proposed qualifying works. An Award is made through the statutory surveyor dispute-resolution procedure.
Who prepares the Award?
The appointed agreed surveyor or the surveyors acting through the statutory procedure prepare and make the Award. Owners cannot act as their own statutory surveyors.
Does the Award grant planning permission?
No. Party wall matters, planning permission, building regulations and structural design are separate requirements. An Award does not replace the other approvals or professional services a project needs.
Can an owner challenge an Award?
An owner can appeal to the county court within 14 days of service. Obtain prompt legal advice if considering an appeal, because the deadline is short.
Can you guarantee how quickly an Award will be ready?
No universal timescale is appropriate. The programme depends on notices, appointments, drawings, access, responses and issues to resolve. The service quotation will explain the proposed scope.
Discuss an Award or existing appointment
Tell us whether you are planning work or responding to a neighbour’s proposals. Include the property address, the stage reached and any notices or drawings you already have. We will confirm the appropriate scope and fees before instruction.
Call 020 7736 2383 or send our team a message if you would like advice before requesting a quotation.